V-Model: What Is It And How Do You Use It? (2024)

The V-Model is a unique, linear development methodology used during a software development life cycle (SDLC). The V-Model focuses on a fairly typicalwaterfall-esquemethod that follows strict, step-by-step stages. While initial stages are broad design stages, progress proceeds down through more and more granular stages, leading into implementation and coding, and finally back through all testing stages prior to completion of the project.

In this article we'll examine just what the V-Model actually entails, and why it may (or may not) be suitable for certain types of projects or organizations.

Some more specific takes on SDLC include:

Rapid Application Development Test-Driven Development Waterfall Model
Iterative Model Extreme Programming Scaled Agile Framework
Agile Model Scrum Rational Unified Process
Big Bang Model Software Development Life Cycle Conceptual Model
Kaizen Model Kanban Model Spiral Model

The Process of the V-Model

Much like the traditionalwaterfall model, the V-Model specifies a series of linear stages that should occur across the life cycle, one at a time, until the project is complete. For this reason V-Model is not considered anagiledevelopment method, and due to the sheer volume of stages and their integration, understanding the model in detail can be challenging for everyone on the team, let alone clients or users.

To begin, it's best to visualize the rough stages of the V-Model, as seen in the diagram below.

V-Model: What Is It And How Do You Use It? (1)

Image courtesy ofWikipedia.org

The V-shape of the V-Model method represents the various stages that will be passed through during the software development life cycle. Beginning at the top-left stage and working, over time, toward the top-right tip, the stages represent a linear progression of development similar to thewaterfall model.

Below we'll briefly discuss each of roughly nine stages involved in the typical V-Model and how they all come together to generate a finished product.

Requirements

During this initial phase, system requirements and analysis are performed to determine the feature set and needs of users. Just as with the same phase from thewaterfall modelor other similar methods, spending enough time and creating thorough user requirement documentation is critical during this phase, as it only occurs once.

Another component unique to the V-Model is that during eachdesignstage, the corresponding tests arealsodesigned to be implemented later during thetestingstages. Thus, during therequirementsphase,acceptance testsare designed.

System Design

Utilizing feedback and user requirement documents created during therequirementsphase, this next stage is used to generate a specification document that will outline all technical components such as the data layers, business logic, and so on.

System Testsare also designed during this stage for later use.

Architecture Design

During this stage, specifications are drawn up that detail how the application will link up all its various components, either internally or via outside integrations. Often this is referred to ashigh-level design.

Integration testsare also developed during this time.

Module Design

This phase consists of all thelow-level designfor the system, including detailed specifications for how all functional, coded business logic will be implemented, such as models, components, interfaces, and so forth.

Unit testsshould also be created during themodule designphase.

Implementation/Coding

At this point, halfway through the stages along the process, the actual coding and implementation occur. This period should allot for as much time as is necessary to convert all previously generated design and specification docs into a coded, functional system. This stage should be fully complete once the testing phases begin.

Unit Testing

Now the process moves back up the far side of the V-Model with inverse testing, starting with theunit testsdeveloped during themodule designphase. Ideally, this phase should eliminate the vast majority of potential bugs and issues, and thus will be the lengthiest testing phase of the project.

That said, just as when performing unit testing with other development models, unit tests cannot (or should not) cover every possible issue that can occur in the system, so the less granular testing phases to follow should fill in these gaps.

Integration Testing

Testing devised during thearchitecture designphase are executed here, ensuring that the system functions across all components and third-party integrations.

System Testing

The tests created duringsystem designare next executed, largely focusing on performance and regression testing.

Acceptance Testing

Lastly,acceptance testingis the process of implementing all tests created during the initialrequirementsphase and should ensure that the system is functional in a live environment with actual data, ready for deployment.

Advantages of the V-Model

  • Suited for Restricted Projects: Due to the stringent nature of the V-Model and its linear design, implementation, and testing phases, it's perhaps no wonder that the V-Model has been heavily adopted by themedical device industryin recent years. In situations where the project length and scope are well-defined, the technology is stable, and the documentation & design specifications are clear, the V-Model can be a great method.
  • Ideal for Time Management: Along the same vein, V-Model is also well-suited for projects that must maintain a strict deadline and meet key milestone dates throughout the process. With fairly clear and well understood stages that the whole team can easily comprehend and prepare for, it is relatively simple to create a time line for the entire development life cycle, while generating milestones for each stage along the way. Of course, the use of BM in no way ensures milestones will always be met, but the strict nature of the model itself enforces the need to keep to a fairly tight schedule.

Disadvantages of the V-Model

  • Lacks Adaptability: Similar to the issues facing the traditionalwaterfallmodel on which the V-Model is based, the most problematic aspect to the V-Model is its inability to adapt to any necessary changes during the development life cycle. For example, an overlooked issue within some fundamentalsystem design, that is then only discovered during theimplementationphase, can present a severe setback in terms of lost man-hours as well as increased costs.
  • Timeline Restrictions: While not an inherent problem with the V-Model itself, the focus on testing at the end of the life cycle means that it's all too easy to be pigeonholed at the end of the project into performing tests in a rushed manner to meet a particular deadline or milestone.
  • Ill-Suited for Lengthy Life Cycles: Like thewaterfall model, the V-Model is completely linear and thus projects cannot be easily altered once the development train has left the station. V-Model is therefore poorly suited to handle long-term projects that may require many versions or constant updates/patches.
  • Encourages 'Design-by-Committee' Development: While V-Model is certainly not the only development model to fall under this criticism, it cannot be denied that the strict and methodical nature of the V-Model and its various linear stages tend to emphasize a development cycle befitting managers and users, rather than developers and designers. With a method like V-Model, it can be all too easy for project managers or others to overlook the vast complexities of software development in favor of trying to meet deadlines, or to simply feel overly confident in the process or current progress, based solely on what stage in the life cycle is actively being developed.

Written By: Frances Banks

V-Model: What Is It And How Do You Use It? (2024)

FAQs

V-Model: What Is It And How Do You Use It? ›

The V-model is an SDLC model where execution of processes happens in a sequential manner in a V-shape. It is also known as Verification and Validation model. The V-Model is an extension of the waterfall model and is based on the association of a testing phase for each corresponding development stage.

What is the V model and how does it work? ›

V Model in Software testing is an SDLC model where the test execution takes place in a hierarchical manner. The execution process makes a V-shape. It is also called a Verification and Validation model that undertakes the testing process for every development phase.

When should the V model be used? ›

V-Model is used for small projects where project requirements are clear. Simple and easy to understand and use. This model focuses on verification and validation activities early in the life cycle thereby enhancing the probability of building an error-free and good quality product.

What is the concept V model? ›

The V-model or V-cycle is a style of software development that splits the process into three parts: design, implementation, and integration and qualification testing. The letter V is a symbolic representation of the development flow.

How to explain v model in interview? ›

So V-Model contains Verification stages on one side of the Validation stages on the opposite side. The confirmation and Validation process is joined by coding gradually works in V-shape. In this manner, it is called the V-Model.

What are some best practices for using the V-model? ›

Tips for using the V model

Hold discussions with any clients or stakeholders on the project to ensure you have a thorough understanding of their requirements and expectations prior to development so you can create a project that meets their needs. Create meaningful tests.

What are the pros and cons of V-model? ›

The V-model is among the most expensive and time-consuming models yet provides excellent quality control, through early detection of errors in code and architecture. Similar to the traditional Waterfall model, all requirements are pre-set at the beginning and cannot be changed.

What does V-model do? ›

v-model creates a link between the input element value attribute and a data value in the Vue instance. When you change the input, the data updates and when the data changes, the input updates as well (two-way binding).

Is the V-model outdated or still relevant? ›

The linear approach is generally regarded by many as outdated, but this does not mean that it is no longer used anywhere today.

What are the three levels of the V-model? ›

From project definition to project test & validation

The V-model consists of the three major phases Project definition, Implementation and Project test & validation. There are several steps within these phases.

Is the V model agile? ›

Scrum and V-model are separate methodologies. Scrum is Agile, iterative, and collaborative, while V-model is sequential and focuses on verification and validation. They are not typically combined, although certain elements of Scrum can be adapted to fit within the V-model.

What is the difference between V model and waterfall? ›

Waterfall is a sequential, linear approach, while V-Model is an extension of Waterfall that emphasizes testing at each stage. Which Methodology Is More Adaptable to Changing Project Requirements? V-Model is more adaptable to changes compared to traditional Waterfall due to its focus on testing and verification.

What is the V model of a project plan? ›

The V-Model consists of two main phases, represented by the shape of a "V". The left side of the V represents the specification phase, while the right side represents the integration phase. Each phase consists of several stages, each representing different tasks and responsibilities within the project.

What are the challenges of V-model? ›

V-shaped model Some of the shortcomings of V-model are: x Very rigid like the waterfall model. x Little flexibility and adjusting scope is difficult and expensive. x Software is developed during the implementation phase, so no early prototypes of the software are produced.

What is the difference between V-model and W model? ›

In Waterfall model testing activities start after the development activities are over. In V-model testing activities start with the first stage. Guarantee of success through Waterfall model is low. Guarantee of success through V-model is high.

What is risk management in V-model? ›

Risk management is an essential component of the V-Model methodology. It involves identifying potential risks and taking steps to mitigate or eliminate them. The goal of risk management is to ensure that the project is completed on time, within budget, and to the required quality standards.

What is the V-model in healthcare? ›

The V-model demonstrates the relationships between each part of the development life cycle and its associated phase of testing. The horizontal axis represents project completeness (left-to-right) and the vertical axis represents the level of abstraction (top-to-bottom).

What is the conclusion of the V-model? ›

Conclusion: In conclusion, the V-Model is a robust development methodology, highlighting the significance of early testing and validation practices. Its systematic approach aligns development and testing, making it valuable for projects with well-defined requirements and a focus on early error detection.

What is the basic structure of V-model? ›

The top of the V represents the realisation. This is the actual product development, the programming in which the product is created. On the right-hand side of the V are the individual functions and how they are to be tested. These flow together more and more until the overall system is tested in a final step.

Top Articles
Latest Posts
Article information

Author: Domingo Moore

Last Updated:

Views: 5942

Rating: 4.2 / 5 (53 voted)

Reviews: 92% of readers found this page helpful

Author information

Name: Domingo Moore

Birthday: 1997-05-20

Address: 6485 Kohler Route, Antonioton, VT 77375-0299

Phone: +3213869077934

Job: Sales Analyst

Hobby: Kayaking, Roller skating, Cabaret, Rugby, Homebrewing, Creative writing, amateur radio

Introduction: My name is Domingo Moore, I am a attractive, gorgeous, funny, jolly, spotless, nice, fantastic person who loves writing and wants to share my knowledge and understanding with you.